Do you know?
[SE] Generating stations - part 3
- Fact 1 of 12β‘
Idukki: Kerala's largest hydro power station
Idukki has a capacity of 780 MW, from six units of 130 MW each. It is Kerala's largest hydroelectric project. Recall: Idukki's capacity in MW? (780)
- Fact 2 of 12π§
Sabarigiri: 300 MW from four units
Sabarigiri hydro station on the Pamba river has 300 MW, from four units of 55 MW each. Recall: Sabarigiri's capacity in MW? (300)
- Fact 3 of 12πΊοΈ
Sabarigiri lies in Pathanamthitta district
Sabarigiri power station is in Pathanamthitta district, on the Pamba river. Like the KSEB meter at home, its power reaches you through the grid. Recall: Which district? (Pathanamthitta)
- Fact 4 of 12π
Idukki's power house is underground
Idukki's power house is built underground at Moolamattom, protecting machines and saving surface land. Recall: Where is Idukki's power house? (Moolamattom)
- Fact 5 of 12π
Idukki main dam is an arch dam
Like an arch bridge, the curved Idukki dam carries water pressure into the rock sides. Recall: Type of Idukki main dam? (Arch dam)
- Fact 6 of 12π΅
Hydro power needs no fuel
Water is the fuel, so hydro has no fuel bill, like a scooter that never needs petrol. Recall: Main merit of hydro? (No fuel cost)
- Fact 7 of 12π§οΈ
Hydro is renewable: rain refills it
Monsoon rain refills the reservoir every year, so hydro power keeps renewing itself. Recall: What refills the reservoir? (Monsoon rain)
- Fact 8 of 12π
Hydro starts quickly for peak demand
Hydro units start within minutes, so they meet evening peak demand fast, like a bus leaving at once when full. Recall: Why is hydro quick? (Peak demand)
- Fact 9 of 12π₯
Hydro output falls in dry years
Output depends on rain, so weak monsoons and dry summers cut reservoir water and power. Recall: Main demerit of hydro? (Depends on rain)
- Fact 10 of 12π³
Reservoirs submerge land and forest
Reservoirs submerge forest and farm land, and families must be relocated. Recall: Hydro's major social cost? (Displacement of people)
- Fact 11 of 12π°
Hydro has high initial cost
Dams and tunnels cost heavily to build, though the running cost is low. Recall: Hydro's cost drawback? (High initial cost)
- Fact 12 of 12π°
Reservoirs also give drinking water
Dam reservoirs store water for drinking and irrigation, not only for power. Recall: Second use of a reservoir? (Drinking water or irrigation)