QuizKerala

Do you know?

[SE] Distribution systems and UG cables - part 3

8 facts. Swipe through the cards.
Free PSC questions in your emailLDC, LGS, prelims and more. Tell us your exam and get practice questions free.Sign up free
  1. Fact 1 of 8

    Direct laying: cable buried straight in the soil

    Everyday: the cable goes straight into a trench with no pipe. Exam: direct laying system. It is cheap and quick to lay. Recall: which system uses no pipe? Answer: direct laying.

  2. Fact 2 of 8

    Direct laying: sand and bricks guard the cable

    Why: a sand cushion and brick or slab cover protect the cable from spade cuts. Kerala example: a cable under a footpath slab. Recall: what covers the cable? Answer: sand and bricks.

  3. Fact 3 of 8

    Direct laying: every road dig is a risk

    Why: each road repair can cut a buried cable. Exam: direct laying makes repair and fault locating harder. Recall: biggest risk of direct laying? Answer: digging damage.

  4. Fact 4 of 8

    Draw-in: ducts first, cable pulled in later

    Everyday: pipes are laid first, then the cable is threaded in. Exam: draw-in system. Like pulling a thread through a bangle. Recall: what goes in first in draw-in? Answer: ducts or pipes.

  5. Fact 5 of 8

    Draw-in: replace cable without digging the road

    Why: the old cable is pulled out and a new one pulled through the same duct. Useful on busy city roads with bus routes. Recall: what saves digging in draw-in? Answer: reusing ducts.

  6. Fact 6 of 8

    Draw-in: manholes give access for pulling

    Why: manholes at intervals let workers pull the cable in and join it. Exam: too many sharp bends make pulling hard. Recall: what access points help pulling? Answer: manholes.

  7. Fact 7 of 8

    Draw-in: costlier than direct laying

    Why: ducts, manholes and extra labour add cost. Choose it where roads get dug often. Recall: is draw-in costlier or cheaper than direct laying? Answer: costlier.

  8. Fact 8 of 8

    Exam tip: match method to the word

    Everyday: no pipe means direct. Pipe first means draw-in. Exam: direct laying, draw-in and solid are the three laying methods. Recall: which method pulls cable through pipes? Answer: draw-in.